
2.172MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
25Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix LD3 - London, Park Royal is a 2.172 MW (est.) data center in London, United Kingdom operated by Equinix, currently operational. Estimated water use is about 24,787 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.172 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 24,787 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- Wikidata · retrieved 2026-07-19
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix LD3 - London, Park Royal?
- Equinix LD3 - London, Park Royal is a 2.172 MW (est.) data center in London, United Kingdom operated by Equinix, currently operational. Estimated water use is about 24,787 gal/day.
- Where is Equinix LD3 - London, Park Royal located?
- Equinix LD3 - London, Park Royal is located in London, United Kingdom.
- Who operates Equinix LD3 - London, Park Royal?
- Equinix LD3 - London, Park Royal is operated by Equinix.
- How big is Equinix LD3 - London, Park Royal?
- Equinix LD3 - London, Park Royal has an IT power capacity of 2.172 MW. This figure is estimated.
- Is Equinix LD3 - London, Park Royal operational?
- Yes — Equinix LD3 - London, Park Royal is currently operational.
- How much water does Equinix LD3 - London, Park Royal use?
- Equinix LD3 - London, Park Royal has an estimated water use of about 24,787 gallons per day.