Equinix logo

Equinix HE7 - Helsinki, Sinimäki

Espoo, Finland

Operated by Equinix

Active
6.695MWAI est.IT Capacity
76Kgal/dayAI est.Water
45.1dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix HE7 - Helsinki, Sinimäki is a 6.695 MW (est.) data center in Espoo, Finland operated by Equinix, currently operational. Estimated water use is about 76,405 gal/day.

This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Helsinki HE6] (https://www.peeringdb.com/fac/2516)

Last updated: July 25, 2026

IT Power Capacity
6.695 MWAI est.
Water Usage
76,405 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix HE7 - Helsinki, Sinimäki?
Equinix HE7 - Helsinki, Sinimäki is a 6.695 MW (est.) data center in Espoo, Finland operated by Equinix, currently operational. Estimated water use is about 76,405 gal/day.
Where is Equinix HE7 - Helsinki, Sinimäki located?
Equinix HE7 - Helsinki, Sinimäki is located in Espoo, Finland.
Who operates Equinix HE7 - Helsinki, Sinimäki?
Equinix HE7 - Helsinki, Sinimäki is operated by Equinix.
How big is Equinix HE7 - Helsinki, Sinimäki?
Equinix HE7 - Helsinki, Sinimäki has an IT power capacity of 6.695 MW. This figure is estimated.
Is Equinix HE7 - Helsinki, Sinimäki operational?
Yes — Equinix HE7 - Helsinki, Sinimäki is currently operational.
How much water does Equinix HE7 - Helsinki, Sinimäki use?
Equinix HE7 - Helsinki, Sinimäki has an estimated water use of about 76,405 gallons per day.

Data for Equinix HE7 - Helsinki, Sinimäki sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore