2.357MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
27Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix HE5 - Helsinki, Viikinmäki is a 2.357 MW (est.) data center in Helsinki, Finland operated by Equinix, currently operational. Estimated water use is about 26,899 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.357 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 26,899 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix HE5 - Helsinki, Viikinmäki?
- Equinix HE5 - Helsinki, Viikinmäki is a 2.357 MW (est.) data center in Helsinki, Finland operated by Equinix, currently operational. Estimated water use is about 26,899 gal/day.
- Where is Equinix HE5 - Helsinki, Viikinmäki located?
- Equinix HE5 - Helsinki, Viikinmäki is located in Helsinki, Finland.
- Who operates Equinix HE5 - Helsinki, Viikinmäki?
- Equinix HE5 - Helsinki, Viikinmäki is operated by Equinix.
- How big is Equinix HE5 - Helsinki, Viikinmäki?
- Equinix HE5 - Helsinki, Viikinmäki has an IT power capacity of 2.357 MW. This figure is estimated.
- Is Equinix HE5 - Helsinki, Viikinmäki operational?
- Yes — Equinix HE5 - Helsinki, Viikinmäki is currently operational.
- How much water does Equinix HE5 - Helsinki, Viikinmäki use?
- Equinix HE5 - Helsinki, Viikinmäki has an estimated water use of about 26,899 gallons per day.