Equinix GV2 - Geneva, West

Geneva, GE, Switzerland

Operated by Equinix

Active
1.994MWAI est.IT Capacity
23Kgal/dayAI est.Water
39.8dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix GV2 - Geneva, West is a 1.994 MW (est.) data center in Geneva, GE, Switzerland operated by Equinix, currently operational. Estimated water use is about 22,756 gal/day.

This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Geneva GV1] (https://www.peeringdb.com/fac/139)

Last updated: July 24, 2026

IT Power Capacity
1.994 MWAI est.
Water Usage
22,756 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix GV2 - Geneva, West?
Equinix GV2 - Geneva, West is a 1.994 MW (est.) data center in Geneva, GE, Switzerland operated by Equinix, currently operational. Estimated water use is about 22,756 gal/day.
Where is Equinix GV2 - Geneva, West located?
Equinix GV2 - Geneva, West is located in Geneva, GE, Switzerland.
Who operates Equinix GV2 - Geneva, West?
Equinix GV2 - Geneva, West is operated by Equinix.
How big is Equinix GV2 - Geneva, West?
Equinix GV2 - Geneva, West has an IT power capacity of 1.994 MW. This figure is estimated.
Is Equinix GV2 - Geneva, West operational?
Yes — Equinix GV2 - Geneva, West is currently operational.
How much water does Equinix GV2 - Geneva, West use?
Equinix GV2 - Geneva, West has an estimated water use of about 22,756 gallons per day.