1.994MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
23Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix GV2 - Geneva, West is a 1.994 MW (est.) data center in Geneva, GE, Switzerland operated by Equinix, currently operational. Estimated water use is about 22,756 gal/day.
This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Geneva GV1] (https://www.peeringdb.com/fac/139)
Last updated: July 24, 2026
- IT Power Capacity
- 1.994 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 22,756 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix GV2 - Geneva, West?
- Equinix GV2 - Geneva, West is a 1.994 MW (est.) data center in Geneva, GE, Switzerland operated by Equinix, currently operational. Estimated water use is about 22,756 gal/day.
- Where is Equinix GV2 - Geneva, West located?
- Equinix GV2 - Geneva, West is located in Geneva, GE, Switzerland.
- Who operates Equinix GV2 - Geneva, West?
- Equinix GV2 - Geneva, West is operated by Equinix.
- How big is Equinix GV2 - Geneva, West?
- Equinix GV2 - Geneva, West has an IT power capacity of 1.994 MW. This figure is estimated.
- Is Equinix GV2 - Geneva, West operational?
- Yes — Equinix GV2 - Geneva, West is currently operational.
- How much water does Equinix GV2 - Geneva, West use?
- Equinix GV2 - Geneva, West has an estimated water use of about 22,756 gallons per day.