Equinix logo

Equinix DX1 - Dubai

Dubai, United Arab Emirates

Operated by Equinix

Active
5.353MWAI est.IT Capacity
61Kgal/dayAI est.Water
44.1dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix DX1 - Dubai is a 5.353 MW (est.) data center in Dubai, United Arab Emirates operated by Equinix, currently operational. Estimated water use is about 61,090 gal/day.

This facility is part of the [Equinix Dubai Campus] (https://www.peeringdb.com/campus/117) with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Dubai DX3] (https://www.peeringdb.com/fac/14653)

Last updated: July 24, 2026

IT Power Capacity
5.353 MWAI est.
Water Usage
61,090 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix DX1 - Dubai?
Equinix DX1 - Dubai is a 5.353 MW (est.) data center in Dubai, United Arab Emirates operated by Equinix, currently operational. Estimated water use is about 61,090 gal/day.
Where is Equinix DX1 - Dubai located?
Equinix DX1 - Dubai is located in Dubai, United Arab Emirates.
Who operates Equinix DX1 - Dubai?
Equinix DX1 - Dubai is operated by Equinix.
How big is Equinix DX1 - Dubai?
Equinix DX1 - Dubai has an IT power capacity of 5.353 MW. This figure is estimated.
Is Equinix DX1 - Dubai operational?
Yes — Equinix DX1 - Dubai is currently operational.
How much water does Equinix DX1 - Dubai use?
Equinix DX1 - Dubai has an estimated water use of about 61,090 gallons per day.

Data for Equinix DX1 - Dubai sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore