
3.553MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
41Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix CH7 - Westmont is a 3.553 MW (est.) data center in Westmont, IL, United States operated by Equinix, currently operational. Estimated water use is about 40,548 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.553 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 40,548 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix CH7 - Westmont?
- Equinix CH7 - Westmont is a 3.553 MW (est.) data center in Westmont, IL, United States operated by Equinix, currently operational. Estimated water use is about 40,548 gal/day.
- Where is Equinix CH7 - Westmont located?
- Equinix CH7 - Westmont is located in Westmont, IL, United States.
- Who operates Equinix CH7 - Westmont?
- Equinix CH7 - Westmont is operated by Equinix.
- How big is Equinix CH7 - Westmont?
- Equinix CH7 - Westmont has an IT power capacity of 3.553 MW. This figure is estimated.
- Is Equinix CH7 - Westmont operational?
- Yes — Equinix CH7 - Westmont is currently operational.
- How much water does Equinix CH7 - Westmont use?
- Equinix CH7 - Westmont has an estimated water use of about 40,548 gallons per day.