1.277MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
15Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
37.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix CA1 - Canberra is a 1.277 MW (est.) data center in Mitchell, Australia operated by Equinix, currently operational. Estimated water use is about 14,573 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.277 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 14,573 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix CA1 - Canberra?
- Equinix CA1 - Canberra is a 1.277 MW (est.) data center in Mitchell, Australia operated by Equinix, currently operational. Estimated water use is about 14,573 gal/day.
- Where is Equinix CA1 - Canberra located?
- Equinix CA1 - Canberra is located in Mitchell, Australia.
- Who operates Equinix CA1 - Canberra?
- Equinix CA1 - Canberra is operated by Equinix.
- How big is Equinix CA1 - Canberra?
- Equinix CA1 - Canberra has an IT power capacity of 1.277 MW. This figure is estimated.
- Is Equinix CA1 - Canberra operational?
- Yes — Equinix CA1 - Canberra is currently operational.
- How much water does Equinix CA1 - Canberra use?
- Equinix CA1 - Canberra has an estimated water use of about 14,573 gallons per day.