
8.49MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
97Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EdgeCore Digital InfrastructureOperator
About this facility
EdgeCore Phoenix is a 8.49 MW (est.) data center in Mesa, AZ, United States operated by EdgeCore Digital Infrastructure, currently operational. Estimated water use is about 96,890 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 8.49 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 96,890 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is EdgeCore Phoenix?
- EdgeCore Phoenix is a 8.49 MW (est.) data center in Mesa, AZ, United States operated by EdgeCore Digital Infrastructure, currently operational. Estimated water use is about 96,890 gal/day.
- Where is EdgeCore Phoenix located?
- EdgeCore Phoenix is located in Mesa, AZ, United States.
- Who operates EdgeCore Phoenix?
- EdgeCore Phoenix is operated by EdgeCore Digital Infrastructure.
- How big is EdgeCore Phoenix?
- EdgeCore Phoenix has an IT power capacity of 8.49 MW. This figure is estimated.
- Is EdgeCore Phoenix operational?
- Yes — EdgeCore Phoenix is currently operational.
- How much water does EdgeCore Phoenix use?
- EdgeCore Phoenix has an estimated water use of about 96,890 gallons per day.