TKRZ Stadtwerke GmbH logo

DMO - Datacenter Münster Osnabrück (DMO1)

Greven, Münster, Germany

Operated by TKRZ Stadtwerke GmbH

Active
0.345MWAI est.IT Capacity
4Kgal/dayAI est.Water
32.2dB(A)AI est.Est. Noise
TKRZ Stadtwerke GmbHOperator

About this facility

DMO - Datacenter Münster Osnabrück (DMO1) is a 0.345 MW (est.) data center in Greven, Münster, Germany operated by TKRZ Stadtwerke GmbH, currently operational. Estimated water use is about 3,937 gal/day.

High-availability data centers form the backbone of digitalization. With the “DMO - Datacenter Münster Osnabrück”, the most modern data center in the region is being built at Münster Osnabrück Airport. Planning for the construction and operation of the regional data center has been underway since 2022. So that we can concentrate fully on our mission: Strengthening resilience through stability in digitalization. This was preceded by numerous considerations as to how the two parent companies can …

Last updated: July 24, 2026

IT Power Capacity
0.345 MWAI est.
Water Usage
3,937 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is DMO - Datacenter Münster Osnabrück (DMO1)?
DMO - Datacenter Münster Osnabrück (DMO1) is a 0.345 MW (est.) data center in Greven, Münster, Germany operated by TKRZ Stadtwerke GmbH, currently operational. Estimated water use is about 3,937 gal/day.
Where is DMO - Datacenter Münster Osnabrück (DMO1) located?
DMO - Datacenter Münster Osnabrück (DMO1) is located in Greven, Münster, Germany.
Who operates DMO - Datacenter Münster Osnabrück (DMO1)?
DMO - Datacenter Münster Osnabrück (DMO1) is operated by TKRZ Stadtwerke GmbH.
How big is DMO - Datacenter Münster Osnabrück (DMO1)?
DMO - Datacenter Münster Osnabrück (DMO1) has an IT power capacity of 0.345 MW. This figure is estimated.
Is DMO - Datacenter Münster Osnabrück (DMO1) operational?
Yes — DMO - Datacenter Münster Osnabrück (DMO1) is currently operational.
How much water does DMO - Datacenter Münster Osnabrück (DMO1) use?
DMO - Datacenter Münster Osnabrück (DMO1) has an estimated water use of about 3,937 gallons per day.

Data for DMO - Datacenter Münster Osnabrück (DMO1) sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore