
About this facility
Digital Realty London LON1-3 is a 2.002 MW (est.) data center in London, United Kingdom operated by Digital Realty, currently operational. Estimated water use is about 22,847 gal/day.
Interxion's City campus (LON1, LON2, LON3 and Oliver's Yard) is all interconnected with redundant dark fibre. It is possible to connect between any of the data centres with a standard cross connect. There is also a pre-installed Metro Connect solution between Interxion's Docklands Campus (Sovereign House, Sovereign House North and Cloud House) providing redundant dark fibre and 10G and 100G connections between the campuses.
Last updated: July 24, 2026
- IT Power Capacity
- 2.002 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 22,847 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Digital Realty London LON1-3?
- Digital Realty London LON1-3 is a 2.002 MW (est.) data center in London, United Kingdom operated by Digital Realty, currently operational. Estimated water use is about 22,847 gal/day.
- Where is Digital Realty London LON1-3 located?
- Digital Realty London LON1-3 is located in London, United Kingdom.
- Who operates Digital Realty London LON1-3?
- Digital Realty London LON1-3 is operated by Digital Realty.
- How big is Digital Realty London LON1-3?
- Digital Realty London LON1-3 has an IT power capacity of 2.002 MW. This figure is estimated.
- Is Digital Realty London LON1-3 operational?
- Yes — Digital Realty London LON1-3 is currently operational.
- How much water does Digital Realty London LON1-3 use?
- Digital Realty London LON1-3 has an estimated water use of about 22,847 gallons per day.