
30.754MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
351Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
51.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Digital RealtyOperator
About this facility
Digital Realty IAD (21625 Gresham) is a 30.754 MW (est.) data center in Ashburn, VA, United States operated by Digital Realty, currently operational. Estimated water use is about 350,972 gal/day.
fka: Dupont Fabros ACC7
Last updated: July 24, 2026
- IT Power Capacity
- 30.754 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 350,972 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Digital Realty IAD (21625 Gresham)?
- Digital Realty IAD (21625 Gresham) is a 30.754 MW (est.) data center in Ashburn, VA, United States operated by Digital Realty, currently operational. Estimated water use is about 350,972 gal/day.
- Where is Digital Realty IAD (21625 Gresham) located?
- Digital Realty IAD (21625 Gresham) is located in Ashburn, VA, United States.
- Who operates Digital Realty IAD (21625 Gresham)?
- Digital Realty IAD (21625 Gresham) is operated by Digital Realty.
- How big is Digital Realty IAD (21625 Gresham)?
- Digital Realty IAD (21625 Gresham) has an IT power capacity of 30.754 MW. This figure is estimated.
- Is Digital Realty IAD (21625 Gresham) operational?
- Yes — Digital Realty IAD (21625 Gresham) is currently operational.
- How much water does Digital Realty IAD (21625 Gresham) use?
- Digital Realty IAD (21625 Gresham) has an estimated water use of about 350,972 gallons per day.