
0.392MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
4Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
32.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Digital Edge DCOperator
About this facility
Digital Edge TYO2 (ComSpace 1) - Tokyo is a 0.392 MW (est.) data center in Tokyo, Japan operated by Digital Edge DC, currently operational. Estimated water use is about 4,474 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.392 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 4,474 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Digital Edge TYO2 (ComSpace 1) - Tokyo?
- Digital Edge TYO2 (ComSpace 1) - Tokyo is a 0.392 MW (est.) data center in Tokyo, Japan operated by Digital Edge DC, currently operational. Estimated water use is about 4,474 gal/day.
- Where is Digital Edge TYO2 (ComSpace 1) - Tokyo located?
- Digital Edge TYO2 (ComSpace 1) - Tokyo is located in Tokyo, Japan.
- Who operates Digital Edge TYO2 (ComSpace 1) - Tokyo?
- Digital Edge TYO2 (ComSpace 1) - Tokyo is operated by Digital Edge DC.
- How big is Digital Edge TYO2 (ComSpace 1) - Tokyo?
- Digital Edge TYO2 (ComSpace 1) - Tokyo has an IT power capacity of 0.392 MW. This figure is estimated.
- Is Digital Edge TYO2 (ComSpace 1) - Tokyo operational?
- Yes — Digital Edge TYO2 (ComSpace 1) - Tokyo is currently operational.
- How much water does Digital Edge TYO2 (ComSpace 1) - Tokyo use?
- Digital Edge TYO2 (ComSpace 1) - Tokyo has an estimated water use of about 4,474 gallons per day.