3.158MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
36Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
DigiCoOperator
About this facility
DigiCo Brisbane BNE2 (iseek LDR2) is a 3.158 MW (est.) data center in Eagle Farm, QLD, Australia operated by DigiCo, currently operational. Estimated water use is about 36,040 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.158 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 36,040 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is DigiCo Brisbane BNE2 (iseek LDR2)?
- DigiCo Brisbane BNE2 (iseek LDR2) is a 3.158 MW (est.) data center in Eagle Farm, QLD, Australia operated by DigiCo, currently operational. Estimated water use is about 36,040 gal/day.
- Where is DigiCo Brisbane BNE2 (iseek LDR2) located?
- DigiCo Brisbane BNE2 (iseek LDR2) is located in Eagle Farm, QLD, Australia.
- Who operates DigiCo Brisbane BNE2 (iseek LDR2)?
- DigiCo Brisbane BNE2 (iseek LDR2) is operated by DigiCo.
- How big is DigiCo Brisbane BNE2 (iseek LDR2)?
- DigiCo Brisbane BNE2 (iseek LDR2) has an IT power capacity of 3.158 MW. This figure is estimated.
- Is DigiCo Brisbane BNE2 (iseek LDR2) operational?
- Yes — DigiCo Brisbane BNE2 (iseek LDR2) is currently operational.
- How much water does DigiCo Brisbane BNE2 (iseek LDR2) use?
- DigiCo Brisbane BNE2 (iseek LDR2) has an estimated water use of about 36,040 gallons per day.