
2.142MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
24Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
DCStar NVOperator
About this facility
DCstar Datacenter Oostkamp DCO is a 2.142 MW (est.) data center in Oostkamp, West Vlaanderen, Belgium operated by DCStar NV, currently operational. Estimated water use is about 24,445 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.142 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 24,445 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is DCstar Datacenter Oostkamp DCO?
- DCstar Datacenter Oostkamp DCO is a 2.142 MW (est.) data center in Oostkamp, West Vlaanderen, Belgium operated by DCStar NV, currently operational. Estimated water use is about 24,445 gal/day.
- Where is DCstar Datacenter Oostkamp DCO located?
- DCstar Datacenter Oostkamp DCO is located in Oostkamp, West Vlaanderen, Belgium.
- Who operates DCstar Datacenter Oostkamp DCO?
- DCstar Datacenter Oostkamp DCO is operated by DCStar NV.
- How big is DCstar Datacenter Oostkamp DCO?
- DCstar Datacenter Oostkamp DCO has an IT power capacity of 2.142 MW. This figure is estimated.
- Is DCstar Datacenter Oostkamp DCO operational?
- Yes — DCstar Datacenter Oostkamp DCO is currently operational.
- How much water does DCstar Datacenter Oostkamp DCO use?
- DCstar Datacenter Oostkamp DCO has an estimated water use of about 24,445 gallons per day.