DC74-CLT4

Charlotte, NC, United States

Operated by DC74 Data Centers

Active
1.36MWAI est.IT Capacity
16Kgal/dayAI est.Water
38.1dB(A)AI est.Est. Noise
DC74 Data CentersOperator

About this facility

DC74-CLT4 is a 1.36 MW (est.) data center in Charlotte, NC, United States operated by DC74 Data Centers, currently operational. Estimated water use is about 15,521 gal/day.

Last updated: July 24, 2026

IT Power Capacity
1.36 MWAI est.
Water Usage
15,521 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is DC74-CLT4?
DC74-CLT4 is a 1.36 MW (est.) data center in Charlotte, NC, United States operated by DC74 Data Centers, currently operational. Estimated water use is about 15,521 gal/day.
Where is DC74-CLT4 located?
DC74-CLT4 is located in Charlotte, NC, United States.
Who operates DC74-CLT4?
DC74-CLT4 is operated by DC74 Data Centers.
How big is DC74-CLT4?
DC74-CLT4 has an IT power capacity of 1.36 MW. This figure is estimated.
Is DC74-CLT4 operational?
Yes — DC74-CLT4 is currently operational.
How much water does DC74-CLT4 use?
DC74-CLT4 has an estimated water use of about 15,521 gallons per day.

Data for DC74-CLT4 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore