Active
1.36MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
16Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
38.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
DC74 Data CentersOperator
About this facility
DC74-CLT4 is a 1.36 MW (est.) data center in Charlotte, NC, United States operated by DC74 Data Centers, currently operational. Estimated water use is about 15,521 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.36 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 15,521 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is DC74-CLT4?
- DC74-CLT4 is a 1.36 MW (est.) data center in Charlotte, NC, United States operated by DC74 Data Centers, currently operational. Estimated water use is about 15,521 gal/day.
- Where is DC74-CLT4 located?
- DC74-CLT4 is located in Charlotte, NC, United States.
- Who operates DC74-CLT4?
- DC74-CLT4 is operated by DC74 Data Centers.
- How big is DC74-CLT4?
- DC74-CLT4 has an IT power capacity of 1.36 MW. This figure is estimated.
- Is DC74-CLT4 operational?
- Yes — DC74-CLT4 is currently operational.
- How much water does DC74-CLT4 use?
- DC74-CLT4 has an estimated water use of about 15,521 gallons per day.