5.837MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
67Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
ANTELOperator
About this facility
Data Center Internacional Ingeniero Jose Luis Massera is a 5.837 MW (est.) data center in Pando, Canelones, Uruguay operated by ANTEL, currently operational. Estimated water use is about 66,613 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 5.837 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 66,613 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Data Center Internacional Ingeniero Jose Luis Massera?
- Data Center Internacional Ingeniero Jose Luis Massera is a 5.837 MW (est.) data center in Pando, Canelones, Uruguay operated by ANTEL, currently operational. Estimated water use is about 66,613 gal/day.
- Where is Data Center Internacional Ingeniero Jose Luis Massera located?
- Data Center Internacional Ingeniero Jose Luis Massera is located in Pando, Canelones, Uruguay.
- Who operates Data Center Internacional Ingeniero Jose Luis Massera?
- Data Center Internacional Ingeniero Jose Luis Massera is operated by ANTEL.
- How big is Data Center Internacional Ingeniero Jose Luis Massera?
- Data Center Internacional Ingeniero Jose Luis Massera has an IT power capacity of 5.837 MW. This figure is estimated.
- Is Data Center Internacional Ingeniero Jose Luis Massera operational?
- Yes — Data Center Internacional Ingeniero Jose Luis Massera is currently operational.
- How much water does Data Center Internacional Ingeniero Jose Luis Massera use?
- Data Center Internacional Ingeniero Jose Luis Massera has an estimated water use of about 66,613 gallons per day.