19.948MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
228Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
49.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CyrusOne Inc.Operator
About this facility
CyrusOne Sterling is a 19.948 MW (est.) data center in Sterling, VA, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 227,651 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 19.948 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 227,651 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is CyrusOne Sterling?
- CyrusOne Sterling is a 19.948 MW (est.) data center in Sterling, VA, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 227,651 gal/day.
- Where is CyrusOne Sterling located?
- CyrusOne Sterling is located in Sterling, VA, United States.
- Who operates CyrusOne Sterling?
- CyrusOne Sterling is operated by CyrusOne Inc..
- How big is CyrusOne Sterling?
- CyrusOne Sterling has an IT power capacity of 19.948 MW. This figure is estimated.
- Is CyrusOne Sterling operational?
- Yes — CyrusOne Sterling is currently operational.
- How much water does CyrusOne Sterling use?
- CyrusOne Sterling has an estimated water use of about 227,651 gallons per day.