
18.671MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
213Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
49.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CyrusOne Inc.Operator
About this facility
CyrusOne Austin (Met 2) is a 18.671 MW (est.) data center in Austin, TX, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 213,078 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 18.671 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 213,078 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is CyrusOne Austin (Met 2)?
- CyrusOne Austin (Met 2) is a 18.671 MW (est.) data center in Austin, TX, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 213,078 gal/day.
- Where is CyrusOne Austin (Met 2) located?
- CyrusOne Austin (Met 2) is located in Austin, TX, United States.
- Who operates CyrusOne Austin (Met 2)?
- CyrusOne Austin (Met 2) is operated by CyrusOne Inc..
- How big is CyrusOne Austin (Met 2)?
- CyrusOne Austin (Met 2) has an IT power capacity of 18.671 MW. This figure is estimated.
- Is CyrusOne Austin (Met 2) operational?
- Yes — CyrusOne Austin (Met 2) is currently operational.
- How much water does CyrusOne Austin (Met 2) use?
- CyrusOne Austin (Met 2) has an estimated water use of about 213,078 gallons per day.