1.031MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
12Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
36.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
conova communications GmbHOperator
About this facility
conova - Datacenter 6/7 is a 1.031 MW (est.) data center in Hallein, Salzburg, Austria operated by conova communications GmbH, currently operational. Estimated water use is about 11,766 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 1.031 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 11,766 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is conova - Datacenter 6/7?
- conova - Datacenter 6/7 is a 1.031 MW (est.) data center in Hallein, Salzburg, Austria operated by conova communications GmbH, currently operational. Estimated water use is about 11,766 gal/day.
- Where is conova - Datacenter 6/7 located?
- conova - Datacenter 6/7 is located in Hallein, Salzburg, Austria.
- Who operates conova - Datacenter 6/7?
- conova - Datacenter 6/7 is operated by conova communications GmbH.
- How big is conova - Datacenter 6/7?
- conova - Datacenter 6/7 has an IT power capacity of 1.031 MW. This figure is estimated.
- Is conova - Datacenter 6/7 operational?
- Yes — conova - Datacenter 6/7 is currently operational.
- How much water does conova - Datacenter 6/7 use?
- conova - Datacenter 6/7 has an estimated water use of about 11,766 gallons per day.