30.038MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
343Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
51.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CloudHQ, LLCOperator
About this facility
CloudHQ MCC1 is a 30.038 MW (est.) data center in Manassas, VA, United States operated by CloudHQ, LLC, currently operational. Estimated water use is about 342,801 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 30.038 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 342,801 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is CloudHQ MCC1?
- CloudHQ MCC1 is a 30.038 MW (est.) data center in Manassas, VA, United States operated by CloudHQ, LLC, currently operational. Estimated water use is about 342,801 gal/day.
- Where is CloudHQ MCC1 located?
- CloudHQ MCC1 is located in Manassas, VA, United States.
- Who operates CloudHQ MCC1?
- CloudHQ MCC1 is operated by CloudHQ, LLC.
- How big is CloudHQ MCC1?
- CloudHQ MCC1 has an IT power capacity of 30.038 MW. This figure is estimated.
- Is CloudHQ MCC1 operational?
- Yes — CloudHQ MCC1 is currently operational.
- How much water does CloudHQ MCC1 use?
- CloudHQ MCC1 has an estimated water use of about 342,801 gallons per day.