Cheongna AI data center
Incheon, South Korea
50MWIT Capacity
571Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
53.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Cheongna AI data center is a 50 MW data center in Incheon, South Korea, currently under construction. Estimated water use is about 570,612 gal/day.
KT Cloud is constructing a 50MW data center in the Cheongna district of Incheon, greater Seoul, South Korea, with an estimated completion around Q1 2030.
Last updated: October 14, 2026
- IT Power Capacity
- 50 MW
- Water Usage
- 570,612 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-10-08
- AI Estimate · retrieved 2026-10-14
Frequently asked questions
- What is Cheongna AI data center?
- Cheongna AI data center is a 50 MW data center in Incheon, South Korea, currently under construction. Estimated water use is about 570,612 gal/day.
- Where is Cheongna AI data center located?
- Cheongna AI data center is located in Incheon, South Korea.
- How big is Cheongna AI data center?
- Cheongna AI data center has an IT power capacity of 50 MW.
- Is Cheongna AI data center operational?
- Cheongna AI data center is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Cheongna AI data center use?
- Cheongna AI data center has an estimated water use of about 570,612 gallons per day.