
23.183MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
265Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
50.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CentersquareOperator
About this facility
Centersquare Dallas (DFW1) is a 23.183 MW (est.) data center in Fort Worth, TX, United States operated by Centersquare, currently operational. Estimated water use is about 264,570 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 23.183 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 264,570 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Centersquare Dallas (DFW1)?
- Centersquare Dallas (DFW1) is a 23.183 MW (est.) data center in Fort Worth, TX, United States operated by Centersquare, currently operational. Estimated water use is about 264,570 gal/day.
- Where is Centersquare Dallas (DFW1) located?
- Centersquare Dallas (DFW1) is located in Fort Worth, TX, United States.
- Who operates Centersquare Dallas (DFW1)?
- Centersquare Dallas (DFW1) is operated by Centersquare.
- How big is Centersquare Dallas (DFW1)?
- Centersquare Dallas (DFW1) has an IT power capacity of 23.183 MW. This figure is estimated.
- Is Centersquare Dallas (DFW1) operational?
- Yes — Centersquare Dallas (DFW1) is currently operational.
- How much water does Centersquare Dallas (DFW1) use?
- Centersquare Dallas (DFW1) has an estimated water use of about 264,570 gallons per day.