
2.603MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
30Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Celeste SASOperator
About this facility
Celeste Fil d’Ariane is a 2.603 MW (est.) data center in Albi, OCCITANIE, France operated by Celeste SAS, currently operational. Estimated water use is about 29,706 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.603 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 29,706 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Celeste Fil d’Ariane?
- Celeste Fil d’Ariane is a 2.603 MW (est.) data center in Albi, OCCITANIE, France operated by Celeste SAS, currently operational. Estimated water use is about 29,706 gal/day.
- Where is Celeste Fil d’Ariane located?
- Celeste Fil d’Ariane is located in Albi, OCCITANIE, France.
- Who operates Celeste Fil d’Ariane?
- Celeste Fil d’Ariane is operated by Celeste SAS.
- How big is Celeste Fil d’Ariane?
- Celeste Fil d’Ariane has an IT power capacity of 2.603 MW. This figure is estimated.
- Is Celeste Fil d’Ariane operational?
- Yes — Celeste Fil d’Ariane is currently operational.
- How much water does Celeste Fil d’Ariane use?
- Celeste Fil d’Ariane has an estimated water use of about 29,706 gallons per day.