Datacenter United logo

brusselsdc

Zaventem, Belgium

Operated by Datacenter United

Active
0.544MWAI est.IT Capacity
6Kgal/dayAI est.Water
34.2dB(A)AI est.Est. Noise
Datacenter UnitedOperator

About this facility

brusselsdc is a 0.544 MW (est.) data center in Zaventem, Belgium operated by Datacenter United, currently operational. Estimated water use is about 6,208 gal/day.

Last updated: July 24, 2026

IT Power Capacity
0.544 MWAI est.
Water Usage
6,208 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is brusselsdc?
brusselsdc is a 0.544 MW (est.) data center in Zaventem, Belgium operated by Datacenter United, currently operational. Estimated water use is about 6,208 gal/day.
Where is brusselsdc located?
brusselsdc is located in Zaventem, Belgium.
Who operates brusselsdc?
brusselsdc is operated by Datacenter United.
How big is brusselsdc?
brusselsdc has an IT power capacity of 0.544 MW. This figure is estimated.
Is brusselsdc operational?
Yes — brusselsdc is currently operational.
How much water does brusselsdc use?
brusselsdc has an estimated water use of about 6,208 gallons per day.

Data for brusselsdc sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore