QTS Project Wind (Cambois Data Centre Campus)
Cambois, England, United Kingdom
About this facility
QTS Project Wind (Cambois Data Centre Campus) is a 1100 MW data center in Cambois, England, United Kingdom, currently planned. Estimated water use is about 12,553,453 gal/day.
QTS, a Blackstone-owned data center developer, is building a roughly £10bn, up to 10-building Project Wind campus on the former Blyth Power Station coal yards at Cambois, Northumberland. Outline planning consent was granted in March, enabling works began, and first-phase works were approved.
Last updated: November 6, 2026
- IT Power Capacity
- 1100 MW· research_agent
- Water Usage
- 12,553,453 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- bbc.co.uk · retrieved 2026-11-05
- northumberland.gov.uk · retrieved 2026-11-05
- datacenterdynamics.com · retrieved 2026-11-05
- environment-agency.gov.uk · retrieved 2026-11-05
- environment-agency.gov.uk · retrieved 2026-11-05
- chroniclelive.co.uk · retrieved 2026-11-05
- AI Estimate · retrieved 2026-11-06
Frequently asked questions
- What is QTS Project Wind (Cambois Data Centre Campus)?
- QTS Project Wind (Cambois Data Centre Campus) is a 1100 MW data center in Cambois, England, United Kingdom, currently planned. Estimated water use is about 12,553,453 gal/day.
- Where is QTS Project Wind (Cambois Data Centre Campus) located?
- QTS Project Wind (Cambois Data Centre Campus) is located in Cambois, England, United Kingdom.
- How big is QTS Project Wind (Cambois Data Centre Campus)?
- QTS Project Wind (Cambois Data Centre Campus) has an IT power capacity of 1100 MW.
- Is QTS Project Wind (Cambois Data Centre Campus) operational?
- QTS Project Wind (Cambois Data Centre Campus) is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does QTS Project Wind (Cambois Data Centre Campus) use?
- QTS Project Wind (Cambois Data Centre Campus) has an estimated water use of about 12,553,453 gallons per day.