
5.93MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
68Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Borealis Data CenterOperator
About this facility
Blönduós Campus is a 5.93 MW (est.) data center in Blönduós, Iceland operated by Borealis Data Center, currently operational. Estimated water use is about 67,675 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 5.93 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 67,675 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Blönduós Campus?
- Blönduós Campus is a 5.93 MW (est.) data center in Blönduós, Iceland operated by Borealis Data Center, currently operational. Estimated water use is about 67,675 gal/day.
- Where is Blönduós Campus located?
- Blönduós Campus is located in Blönduós, Iceland.
- Who operates Blönduós Campus?
- Blönduós Campus is operated by Borealis Data Center.
- How big is Blönduós Campus?
- Blönduós Campus has an IT power capacity of 5.93 MW. This figure is estimated.
- Is Blönduós Campus operational?
- Yes — Blönduós Campus is currently operational.
- How much water does Blönduós Campus use?
- Blönduós Campus has an estimated water use of about 67,675 gallons per day.