6.679MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
76Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
45dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Ascenty DataCenters e TelecomOperator
About this facility
Ascenty FTZ01 - Fortaleza is a 6.679 MW (est.) data center in Maracanaú, Brazil operated by Ascenty DataCenters e Telecom, currently operational. Estimated water use is about 76,222 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 6.679 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 76,222 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Ascenty FTZ01 - Fortaleza?
- Ascenty FTZ01 - Fortaleza is a 6.679 MW (est.) data center in Maracanaú, Brazil operated by Ascenty DataCenters e Telecom, currently operational. Estimated water use is about 76,222 gal/day.
- Where is Ascenty FTZ01 - Fortaleza located?
- Ascenty FTZ01 - Fortaleza is located in Maracanaú, Brazil.
- Who operates Ascenty FTZ01 - Fortaleza?
- Ascenty FTZ01 - Fortaleza is operated by Ascenty DataCenters e Telecom.
- How big is Ascenty FTZ01 - Fortaleza?
- Ascenty FTZ01 - Fortaleza has an IT power capacity of 6.679 MW. This figure is estimated.
- Is Ascenty FTZ01 - Fortaleza operational?
- Yes — Ascenty FTZ01 - Fortaleza is currently operational.
- How much water does Ascenty FTZ01 - Fortaleza use?
- Ascenty FTZ01 - Fortaleza has an estimated water use of about 76,222 gallons per day.