About this facility
Applied Digital Delta Forge 1 is a 430 MW data center in Boyce, LA, United States operated by Applied Digital, currently under construction. Estimated water use is about 4,907,259 gal/day.
Applied Digital's Delta Forge 1 is an AI data center campus in Boyce, Rapides Parish, Louisiana, previously reported locally as Project Lightning. Louisiana Economic Development says site development began in January 2026, with initial operations expected in mid-2027. The state describes 300 MW of critical IT load across two facilities; reports of the groundbreaking give 430 MW of total power.
Last updated: November 4, 2026
- IT Power Capacity
- 430 MW· manual_review
- Water Usage
- 4,907,259 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Rapides Parish
- Region
- Not available
Sources
- Wikidata · retrieved 2026-11-01
- Louisiana Economic Development · retrieved 2026-11-03
- The Register · retrieved 2026-11-03
- AI Estimate · retrieved 2026-11-04
Frequently asked questions
- What is Applied Digital Delta Forge 1?
- Applied Digital Delta Forge 1 is a 430 MW data center in Boyce, LA, United States operated by Applied Digital, currently under construction. Estimated water use is about 4,907,259 gal/day.
- Where is Applied Digital Delta Forge 1 located?
- Applied Digital Delta Forge 1 is located in Boyce, Rapides Parish, LA, United States.
- Who operates Applied Digital Delta Forge 1?
- Applied Digital Delta Forge 1 is operated by Applied Digital.
- How big is Applied Digital Delta Forge 1?
- Applied Digital Delta Forge 1 has an IT power capacity of 430 MW.
- Is Applied Digital Delta Forge 1 operational?
- Applied Digital Delta Forge 1 is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Applied Digital Delta Forge 1 use?
- Applied Digital Delta Forge 1 has an estimated water use of about 4,907,259 gallons per day.