Under Construction
2000MWIT Capacity
22.8Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
69.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Alpha Digital Campus is a 2000 MW data center in Pecos, TX, United States, currently under construction. Estimated water use is about 22,824,461 gal/day.
PowerBridge is developing Alpha Digital Campus on LandBridge land near Pecos in Reeves County, Texas, and broke ground Nov. 5, 2026 after site preparation began in September. The campus is planned for multi-gigawatt generation; Phase 1 is about 300 MW with first power targeted for Q4 2027. No end users have been announced.
Last updated: November 17, 2026
- IT Power Capacity
- 2000 MW· research_agent
- Water Usage
- 22,824,461 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- datacenterdynamics.com · retrieved 2026-11-16
- landbridgeco.com · retrieved 2026-11-16
- power-bridge.com · retrieved 2026-11-16
- roic.ai · retrieved 2026-11-16
- AI Estimate · retrieved 2026-11-17
Frequently asked questions
- What is Alpha Digital Campus?
- Alpha Digital Campus is a 2000 MW data center in Pecos, TX, United States, currently under construction. Estimated water use is about 22,824,461 gal/day.
- Where is Alpha Digital Campus located?
- Alpha Digital Campus is located in Pecos, TX, United States.
- How big is Alpha Digital Campus?
- Alpha Digital Campus has an IT power capacity of 2000 MW.
- Is Alpha Digital Campus operational?
- Alpha Digital Campus is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Alpha Digital Campus use?
- Alpha Digital Campus has an estimated water use of about 22,824,461 gallons per day.