14.602MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
167Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
48.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Aligned Data CentersOperator
About this facility
Aligned Chicago (ORD-01) is a 14.602 MW (est.) data center in Northlake, IL, United States operated by Aligned Data Centers, currently operational. Estimated water use is about 166,641 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 14.602 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 166,641 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Aligned Chicago (ORD-01)?
- Aligned Chicago (ORD-01) is a 14.602 MW (est.) data center in Northlake, IL, United States operated by Aligned Data Centers, currently operational. Estimated water use is about 166,641 gal/day.
- Where is Aligned Chicago (ORD-01) located?
- Aligned Chicago (ORD-01) is located in Northlake, IL, United States.
- Who operates Aligned Chicago (ORD-01)?
- Aligned Chicago (ORD-01) is operated by Aligned Data Centers.
- How big is Aligned Chicago (ORD-01)?
- Aligned Chicago (ORD-01) has an IT power capacity of 14.602 MW. This figure is estimated.
- Is Aligned Chicago (ORD-01) operational?
- Yes — Aligned Chicago (ORD-01) is currently operational.
- How much water does Aligned Chicago (ORD-01) use?
- Aligned Chicago (ORD-01) has an estimated water use of about 166,641 gallons per day.