10.525MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
120Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
47dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Aligned Data CentersOperator
About this facility
Aligned Ashburn (IAD-01) is a 10.525 MW (est.) data center in Ashburn, VA, United States operated by Aligned Data Centers, currently operational. Estimated water use is about 120,114 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 10.525 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 120,114 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Aligned Ashburn (IAD-01)?
- Aligned Ashburn (IAD-01) is a 10.525 MW (est.) data center in Ashburn, VA, United States operated by Aligned Data Centers, currently operational. Estimated water use is about 120,114 gal/day.
- Where is Aligned Ashburn (IAD-01) located?
- Aligned Ashburn (IAD-01) is located in Ashburn, VA, United States.
- Who operates Aligned Ashburn (IAD-01)?
- Aligned Ashburn (IAD-01) is operated by Aligned Data Centers.
- How big is Aligned Ashburn (IAD-01)?
- Aligned Ashburn (IAD-01) has an IT power capacity of 10.525 MW. This figure is estimated.
- Is Aligned Ashburn (IAD-01) operational?
- Yes — Aligned Ashburn (IAD-01) is currently operational.
- How much water does Aligned Ashburn (IAD-01) use?
- Aligned Ashburn (IAD-01) has an estimated water use of about 120,114 gallons per day.