AirTrunk Operating Pty Ltd logo

AirTrunk MEL1

Derrimut, VIC, Australia

Operated by AirTrunk Operating Pty Ltd

Active
6.824MWAI est.IT Capacity
78Kgal/dayAI est.Water
45.1dB(A)AI est.Est. Noise
AirTrunk Operating Pty LtdOperator

About this facility

AirTrunk MEL1 is a 6.824 MW (est.) data center in Derrimut, VIC, Australia operated by AirTrunk Operating Pty Ltd, currently operational. Estimated water use is about 77,877 gal/day.

Last updated: July 24, 2026

IT Power Capacity
6.824 MWAI est.
Water Usage
77,877 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is AirTrunk MEL1?
AirTrunk MEL1 is a 6.824 MW (est.) data center in Derrimut, VIC, Australia operated by AirTrunk Operating Pty Ltd, currently operational. Estimated water use is about 77,877 gal/day.
Where is AirTrunk MEL1 located?
AirTrunk MEL1 is located in Derrimut, VIC, Australia.
Who operates AirTrunk MEL1?
AirTrunk MEL1 is operated by AirTrunk Operating Pty Ltd.
How big is AirTrunk MEL1?
AirTrunk MEL1 has an IT power capacity of 6.824 MW. This figure is estimated.
Is AirTrunk MEL1 operational?
Yes — AirTrunk MEL1 is currently operational.
How much water does AirTrunk MEL1 use?
AirTrunk MEL1 has an estimated water use of about 77,877 gallons per day.

Data for AirTrunk MEL1 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore