
1.068MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
12Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
37.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
4D Data Centres LtdOperator
About this facility
4D Gatwick (Crawley) is a 1.068 MW (est.) data center in Crawley, West Sussex, United Kingdom operated by 4D Data Centres Ltd, currently operational. Estimated water use is about 12,188 gal/day.
400 rack facility covering 10,000sq ft / 3MVA site located conveniently for Gatwick airport. HPC racks upto 45kW. Dark fibre and wave options from Zayo, Lumen, BT, Openreach, Vodafone as well as IP Transit or Layer 2 services back to Docklands facilities.
Last updated: July 24, 2026
- IT Power Capacity
- 1.068 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 12,188 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is 4D Gatwick (Crawley)?
- 4D Gatwick (Crawley) is a 1.068 MW (est.) data center in Crawley, West Sussex, United Kingdom operated by 4D Data Centres Ltd, currently operational. Estimated water use is about 12,188 gal/day.
- Where is 4D Gatwick (Crawley) located?
- 4D Gatwick (Crawley) is located in Crawley, West Sussex, United Kingdom.
- Who operates 4D Gatwick (Crawley)?
- 4D Gatwick (Crawley) is operated by 4D Data Centres Ltd.
- How big is 4D Gatwick (Crawley)?
- 4D Gatwick (Crawley) has an IT power capacity of 1.068 MW. This figure is estimated.
- Is 4D Gatwick (Crawley) operational?
- Yes — 4D Gatwick (Crawley) is currently operational.
- How much water does 4D Gatwick (Crawley) use?
- 4D Gatwick (Crawley) has an estimated water use of about 12,188 gallons per day.