4D Data Centres Ltd logo

4D Gatwick (Crawley)

Crawley, West Sussex, United Kingdom

Operated by 4D Data Centres Ltd

Active
1.068MWAI est.IT Capacity
12Kgal/dayAI est.Water
37.1dB(A)AI est.Est. Noise
4D Data Centres LtdOperator

About this facility

4D Gatwick (Crawley) is a 1.068 MW (est.) data center in Crawley, West Sussex, United Kingdom operated by 4D Data Centres Ltd, currently operational. Estimated water use is about 12,188 gal/day.

400 rack facility covering 10,000sq ft / 3MVA site located conveniently for Gatwick airport. HPC racks upto 45kW. Dark fibre and wave options from Zayo, Lumen, BT, Openreach, Vodafone as well as IP Transit or Layer 2 services back to Docklands facilities.

Last updated: July 24, 2026

IT Power Capacity
1.068 MWAI est.
Water Usage
12,188 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is 4D Gatwick (Crawley)?
4D Gatwick (Crawley) is a 1.068 MW (est.) data center in Crawley, West Sussex, United Kingdom operated by 4D Data Centres Ltd, currently operational. Estimated water use is about 12,188 gal/day.
Where is 4D Gatwick (Crawley) located?
4D Gatwick (Crawley) is located in Crawley, West Sussex, United Kingdom.
Who operates 4D Gatwick (Crawley)?
4D Gatwick (Crawley) is operated by 4D Data Centres Ltd.
How big is 4D Gatwick (Crawley)?
4D Gatwick (Crawley) has an IT power capacity of 1.068 MW. This figure is estimated.
Is 4D Gatwick (Crawley) operational?
Yes — 4D Gatwick (Crawley) is currently operational.
How much water does 4D Gatwick (Crawley) use?
4D Gatwick (Crawley) has an estimated water use of about 12,188 gallons per day.

Data for 4D Gatwick (Crawley) sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore