21.635MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
247Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
50.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
3HCLOUD LLCOperator
About this facility
3HCloud - WAW-2 is a 21.635 MW (est.) data center in Warsaw, Poland operated by 3HCLOUD LLC, currently operational. Estimated water use is about 246,904 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 21.635 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 246,904 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is 3HCloud - WAW-2?
- 3HCloud - WAW-2 is a 21.635 MW (est.) data center in Warsaw, Poland operated by 3HCLOUD LLC, currently operational. Estimated water use is about 246,904 gal/day.
- Where is 3HCloud - WAW-2 located?
- 3HCloud - WAW-2 is located in Warsaw, Poland.
- Who operates 3HCloud - WAW-2?
- 3HCloud - WAW-2 is operated by 3HCLOUD LLC.
- How big is 3HCloud - WAW-2?
- 3HCloud - WAW-2 has an IT power capacity of 21.635 MW. This figure is estimated.
- Is 3HCloud - WAW-2 operational?
- Yes — 3HCloud - WAW-2 is currently operational.
- How much water does 3HCloud - WAW-2 use?
- 3HCloud - WAW-2 has an estimated water use of about 246,904 gallons per day.